FST Logistics decreased temporary labor needs by 30%
Michael Myers of Lully and Amanda Bush of FST Logistics discussed their operation, achieving 99%+ on-time shipping, decrease travel by 70%, and achieve a 30% reduction in peak season temporary hires.
Results
Client Testimonial Video
The Challenge
Manual, un-optimized wave releasing limited to 500 lines caused excessive picker walking (7–10 miles/day) and high labor costs.
The Solution
Enabled 99% on-time shipping, cut walking by 70%, and handled peak volume with 20 fewer staff.
Learn about how FST logistics took a great operation and made it even better.
You'll hear about how this operation leveraged Lully's Optimizer (API service) to
- Achieve 99% On-Time shipping
- Eliminate the need for manual wave creation
- Unblock their WMS by shifting heaving processing to Lully
- Enable their team to focus on replenishment to keep the floor moving
- Minimize location visits and decrease walking
"In our last peak season before Lully, on our peak day, we shipped 29,000 orders with 60 temporary workers. This peak, with Lully, we shipped roughly 28,000 orders with 20 less people."